![]() |
|
HomeBack Issue ArchivesReader ResourcesSubscriptionsAdvertisingReader FeedbackAbout MSC |
||||
November 1996
Articles
Battling the Snowman The use of a steel frame cut construction time for an apartment building built during Buffalo's cold winter Bridge Crossings No. 01 By Robert L. Nickerson, PE Tips To Insure The Successful Use Of Weathering Steel For Highway Bridges Building Tomorrow's School Today By William Andrews, S.E. Combined library/classroom space is designed to accommodate future technology. (147KB PDF) Flying On The Ground By R. Davidson, RA, J. Englot, PE, & A. Ouzoonian, PE A new monorail system at Newark International Airport is designed to start passengers on a rapid journey. (120KB PDF) Navy Hangar Designed To Resist Hurricanes By By Robert Weilacher A new 600' x 135' clearspan hangar was designed to resist more than 1,300 kips of wind uplift. (139KB PDF) |
![]() ![]() ![]() |
|||||
|
© 2013 Modern Steel Construction. All Rights Reserved American Institute of Steel Construction • One East Wacker Dr., Suite 700 Chicago, IL 60601 |
||||||