![]() |
|
HomeBack Issue ArchivesReader ResourcesSubscriptionsAdvertisingReader FeedbackAbout MSC |
||||
March 2007
Articles
Above-Grade, Below Estimate By Matt Johnson, P.E. The low bid for this steel plate girder viaduct in Omaha came in 6.4 percent under the engineer's cost estimate. (184 KB) Seismic-Resistant Structures: What to Know When Estimating Cost By Patrick M. Hassett, S.E. There's a lot to consider when it comes to estimating costs for steel projects in highseismic areas. (152 KB) Steel Bridge News - March 2007 By Conn Abnee A quarterly feature highlighting the latest news from the National Steel Bridge Alliance. (161 KB) SteelWise: Structural Steel Materials Update By Sergio Zoruba, Ph.D., P.E., adn William Liddy Are you specifying the latest in structural steel materials? This update from AISC's Steel Solutions Center summarizes the latest standards. Communication Breakdown By Brian Raff Effective communication about AISC Certification and its benefits leads to successful and cost-effective steel projects. |
![]() ![]() ![]() |
|||||
|
© 2013 Modern Steel Construction. All Rights Reserved American Institute of Steel Construction • One East Wacker Dr., Suite 700 Chicago, IL 60601 |
||||||