Search

July 1996


Articles

Design/Build Speeds Construction of New Cold Storage Facility
Using the Design / Build concept satisfied the client's need for fast and economical construction of an addition to an existing distribution center. (99KB PDF)


Bookmark and Share

Designing for Wind in Northern California
A hangar's 100-ft. height, coupled with a weidht-conscious design, resulted in a seismic zone 4 structure governed by wind loading. (129KB PDF)


Bookmark and Share

Steel Calendar


Bookmark and Share

Structural Diversity
Shankar Nair is known for both his building and bridge designs (84KB PDF)


Bookmark and Share

Top Gun
An addition to the National Museum of Naval Aviation will showcase the latest aircraft. (136KB PDF)


Bookmark and Share



Departments

Editorial

Steel Quiz